12.27.2002 settore Efficienza energetica settore Elettricità settore Gas Definition of electricity and gas quantities distributed on national territory in 2000 and self-certification of electricity and gas quantities distributed by distribution companies pursuant to decrees of 24 April 2001
In order to determine the quotas of national end-uses efficiency targets pertaining to distribution companies starting from 2002, the Authority publishes the overall electricity and gas quantities distributed on the national territory in 2000, which are respectively 204 TWh and 1.16 billion GJ. Pursuant to decrees of 24 April 2001, the single distribution company's quota has to be calculated by dividing its own electricity and gas quantities distributed by the national quantities. By 30 April 2003, distributors must certify to the Authority the quantities distributed in the previous year.
n. 233/02
Italian Flag
12.23.2002 settore Elettricità Further provisions concerning priority access rights to the transport capacity on interconnections with foreign countries
The Authority modifies resolution n.151/02 specifying some technical details. The deadline for the public announcement by TSO (GRTN) is delayed to 31/01/03.
n. 230/02
Italian Flag
12.23.2002 settore Gas Quarterly adjustment for January-March 2003 of gas supply tariff components and parameters for captive customers
For the first quarter of 2003 Italian Authority for Electricity and Gas has established changes in the gas supply tariff components and parameters for captive market. With regard to the previous level, the index for natural gas purchase costs, is based on international price trends of oil products, has recorded a variation of more than 5%, allowing for a QE parameter increase of 0.0227 Euro cents/MJ. The updated level of QE parameter, which covers the procurement costs of natural gas, is set at 0.3428 Euro cents/MJ.
n. 229/02
Italian Flag
12.23.2002 settore Elettricità Quarterly adjustment for January-March 2003 of electric tariff components and parameters
The Authority publishes the quarterly adjustment of electric tariff components PG, PGT, CCA, PV due to variation in the Ct parameter (variable unit allowed cost of electricity produced by thermoelectric plants using commercial fossil fuels), and the values of components VE, A and UC. The Ct parameter for the period January-March 2003 is equal to 4.106 Euro cents/kWh. The PG parameter is set at 6.165 Euro cents/kWh. The increase in international fuels prices during the period June-November 2002 has caused a rise in the Vt parameter (unit allowed cost of fuels), but the appreciation of the Euro over the Dollar has helped in containing the electric tariff. On average, the rise in the electric tariff is 2.5%.
n. 228/02
Italian Flag
12.23.2002 settore Elettricità Recovering of extra wholesale costs raising from the implementation of art.11 of Bersani's Decree
The art.11 of Bersani's decree n.79/99 requires all producers from conventional fossil fuel sources and importers, with an annual electric flow higher than 100 GWh, to introduce every year (starting from 2002) in the system electricity from renewable sources for an amount of at least 2% of their own production or imports recorded in the previous year. The amount of green energy can be purchased in the Italian Green Certificates Market. The Authority has introduced a new tariff component, VE, for the captive market allowing for the recovering of these purchasing extra-costs sustained by producers and importers and then charged to retailers or distributors with regard to the electricity volumes the latter sell to the captive customers. For the first quarter, the component VE amounts to 0.09 Euro cents/kWh.
n. 227/02
Italian Flag
12.23.2002 settore Elettricità Directives to Enel Spa for the transfer to the captive market of the imported electricity for the year 2003
The Authority establishes that Enel will be responsible for the usage of the interconnection capacity reserved to the captive markets, besides that reserved to long term contracts (200 MW), provisionally till the effectiveness of the single buyer. An incentive mechanism assures that the surplus derived from the spread prices between Italy and foreign countries will be shared between Enel and the captive market.
n. 226/02
Italian Flag
12.19.2002 settore Gas Discipline of general and specific quality levels of gas distribution, measurement and sale services (modification and integration of resolution n.47/00)
The Authority modifies resolution n.47/00 concerning the discipline of general and specific commercial quality levels of gas distribution and sale. In particular, the Authority envisages the graduated extension of the discipline on quality levels also to companies with less than 5000 low pressure customers.
n. 221/02
Italian Flag
12.19.2002 settore Elettricità Discipline of general and specific quality levels of electricity distribution, measurement and sale services (modification and integration of Resolution n.201.99)
The Authority for Electricity and Gas modifies resolution n.201.99 concerning the discipline of general and specific commercial quality levels of electricity distribution and sale in order to take into account both the reduction in the eligibility threshold and the unbundling of distribution and sale activities. In particular, the Authority extend the regime to all medium and low voltage customers; establishes the respective obligations of distribution and sale companies; envisages the graduated extension of the discipline on quality levels also to companies with less than 5000 low voltage customers.
n. 220/02
Italian Flag
12.19.2002 settore Gas Adoption of an action, pursuant to article n.2.20.d of law n.481 of 14 November 1995, towards Snam Rete Gas
The Authority for Electricity and Gas establishes that Snam Rete Gas must remove, within 30 days, a provision included in the conditions for the transportation capacity allocation for 2002-2003 because it can compromise the third party access to the grid. The provision envisaged the possibility for Snam Rete Gas to refuse access to shippers that had not yet paid capacity charges already expired.
n. 219/02
Italian Flag
12.19.2002 settore Gas Approval of proposals about basic tariff options for the thermal year 2002-2003 related to the gas distribution and supply services to the captive market, according to the Authority for Electricity and Gas's Resolution n. 237/00 of 28 December 2000 and its modifications and integration
The Authority for Electricity and Gas approves the proposals for basic tariff options concerning the gas distribution and supply to the captive customers for a group of operators; the tariffs apply from 1 July 2002 to 30 June 2003.
n. 217/02
Italian Flag
12.19.2002 settore Elettricità Adoption of provisions concerning 2003 tariff options for electricity transport and sale to the captive market
In resolution 211/02 the Authority for Electricity and Gas publishes the results of the check on basic and special tariff options for the electricity transportation and on additional tariff options for the sale to the captive market presented by operators for 2003 (172 operators have presented basic and 32 special tariff options, whereas 11 have submitted additional tariff options). resolution 211/02 also introduces a tariff regime that should be offered by operators for the period from 01/01/03 to 31/12/03 in cases where they have not presented basic tariff options for transportation (7 cases): they should apply the corresponding 2002 basic tariff options or, if impossible, the TV2 tariff.
n. 211/02
Italian Flag
12.12.2002 settore Gas Directive to natural gas suppliers to the final customers, in relation to article n.2 of the law n.481 of 14 November 1995
The Authority for Electricity and Gas establishes that natural gas suppliers to two categories of final customers, the captives at the end of year 2002 and the eligible that didn't stipulate new agreements, must continue to apply the conditions in force at 31 December 2002; it is however possible for the customers to accept new contractual offers. The offers to captive customers must follow the criteria established by a future Authority's provision and to be published by 31 march 2003.
n. 207/02
Italian Flag
12.12.2002 settore Elettricità Definition of competitive procedures for 2003 for the transfer by the TSO (GRTN) of the electricity envisaged by article 3 (12) of the legislative decree n.79/99
The Authority sets out the conditions for the competitive procedures through which the TSO (GRTN) must sell the electricity produced by renewable and assimilated sources under the terms of CIP provision n.6/92 (see Minister of Productive Activities' decree of 21/11/00 as modified by the decree of 22/12/02). The Authority defines the mechanism allocating the productive capacity both on an annual and monthly basis. The resolution defines three different auctions regarding eligible customers willing to accept planned outages, willing to improve their consume in F4 hours and others; minimum bid prices are published. Bands are allocated following a decreasing bidding price order.
n. 204/02
Italian Flag
12.12.2002 settore Elettricità Definition of wholesale electricity price for captive market customers for 2003
The resolution n.203/02 sets interim wholesale prices for 2003 for the electricity to captive market to be applied until the bidding system is launched and the AU starts its activity. In particular, the wholesale price component covering fixed generating costs, which is differentiated into time bands (see Authority for Electricity and Gas resolution n.205/99), is determined according to the allowed production costs for thermoelectric plants and reference production levels. With respect to 2002 fixed components, no changes have been set.
n. 203/02
Italian Flag
12.12.2002 settore Elettricità Approval of the rules for the annual transport capacity allocation on the Northwest border
The Authority for Electricity and Gas approves the rules set jointly by the TSO (GRTN) and the Gestionnaire du Riseau de transport de l'ilectriciti for the allocation of the interconnection capacity on the Northwest border for 2003: "Rules of the annual allocation mechanism for export capacities on the Italian northwest border for 2003".
n. 202/02
Italian Flag
11.29.2002 settore Elettricità Postponement of the deadline for the conclusion of the procedure concerning electricity service continuity for 2001
The Authority postpones the deadline for the conclusion of the procedure concerning continuity of the electricity distribution service for 2001. In accordance to the unified code on continuity (resolution n.155/02), within 30 November the Authority must determine the reductions in outages achieved by distributors in the previous year and eventually acknowledge to them costs for the achievement of continuity improvements in the current year. The deadline is postponed to 31 January 2003.
n. 196/02
Italian Flag
11.29.2002 settore Gas Methods for the revision of the energy component of the gas tariffs, following law n.238 of 28 October 2002, and modifications of other resolutions
The Italian government freeze on gas prices has expired at the end of November and the revision of the tariff mechanism comes into effect with resolution n.195/02. Under the new price mechanism, gas supply tariffs to the captive market can only be reviewed and altered on a quarterly basis and not every two months, as is presently the case. Increases in gas tariffs will be based on average changes in international prices in the nine months leading up to the quarter in question rather than six months. Finally, the invariance threshold remains unchanged at 5%. In accordance with the new method, gas tariffs will remain unchanged in December with respect to the values set in July (resolution n.122/02). The variable cost-component Qe, representing the gas procurement for distributors linked to the wholesale gas markets, is stable at 0.3151 €cents/MJ (12.139 €cents/mc).
n. 195/02
Italian Flag
11.29.2002 settore Elettricità Methods for the revision of electricity tariffs components, following law n.238 of 28 October 2002, and modifications of other resolutions
The Italian government freeze on electricity prices has expired at the end of November and the revision of the tariff mechanism comes into effect with resolution n.194/02. Under the new price mechanism, electricity tariffs to captive market can only be reviewed and altered on a quarterly basis and not every two months, as is presently the case. Increases in electricity tariffs will be based on average changes in international fuel prices in the six months leading up to the quarter in question rather than four months. Finally, a higher invariance threshold is set (3% instead of 2%). In accordance with the new method, electricity tariffs will remain unchanged in December with respect to the values set in July (resolution 123/02): the Ct parameter is equal to 3.941 Euro cents/kWh, whereas the PG parameter is set at 6.00 Euro cents/kWh. A and UC components values remain those of the bimester March-April (resolution n.24/02).
n. 194/02
Italian Flag
11.21.2002 settore Elettricità Methods and conditions for the assignments of the transport capacity for electricity import, export and transit through the national transmission grid on the north frontier for the year 2003
The Authority defines the rules for the allocation of the interconnection capacities among Italy and neighbouring countries. The total capacity is divided among franchised market (2255 MW), capacity reserved to Switzerland, Austrian and Slovenian authorities (1500 MW), capacity reserved to interruptible eligible customers (1200 MW of which 600 already allocated last year) and capacity reserved yearly to other eligible customers (1445 MW). In case of capacity scarcity, a pro-rata mechanism is applied to the requests. No company or group of companies can hold capacity rights above 10% on each frontier. The capacity right will be lost by the operators which use less than 80% of their availability. TSO (GRTN) should organise a secondary market, both monthly (or weekly) and daily, for the adjustments between operators, new capacity that could become available during the year, spot quantities. Following the agreement with CRE the allocation of the total interconnection capacity with France is managed jointly by TSO (GRTN) and RTE.
n. 190/02
Italian Flag
11.21.2002 settore Elettricità Agreement between the Authority for Electricity and Gas and the Commission de rigulation de l'ilectricith for the interconnection capacity allocation between Italy and France for the year 2003
The Authority for Electricity and Gas and the Commission de Rigulation de l'Electriciti have signed, on 21 November 2002, an agreement on interconnection allocation rules for the frontiers between Italy, France and Switzerland. Switzerland firms will allocate half of the capacity with Switzerland, while the other half and the total capacity with France will be allocated jointly by TSO (GRTN) and RTE. The allocation mechanism will be the pro rata, yearly and daily for additional available capacities. The two regulators invite Switzerland firms to join the agreement.
n. 189/02
Italian Flag
11.21.2002 settore Elettricità Validity extension of the provisional rules for the allocation of the interconnection capacity between Italy and Greece till 31st December 2002
The Authority confirms the provisional rules for the allocation of the interconnection capacity between Italy and Greece for the period between 31st October and 31st December 2002. The Authority entrusts the TSO (GRTN) to publicly call a new allocation procedure and authorises the TSO (GRTN) to use this interconnection capacity in the period between 31st October and the conclusion of the new allocation.
n. 188/02
Italian Flag
10.29.2002 settore Elettricità Postponement of the due date envisaged by article 9 of resolution n.204/99
Following the resolution of the Administrative Court of Appeal concerning the electricity wholesale prices for captive market for 2001 (resolution n.238/00), the Authority must set new price fixed components for 2001. As a consequence, it has postponed the due date for the certification of 2001 actual and allowed revenue by distributors.
n. 180/02
Italian Flag
09.25.2002 settore Elettricità Delay of the due date for the proposal of electric tariff options for 2003
The resolution establishes a delay of the due date for the proposal of electric tariff options by distribution companies for 2003, from 30 September (art.4.1 of Unified Code, resolution n.228.01) to 31 October 2002. The new tariff options must comply with resolution n.152/02 through which the Authority has updated the electric transport service fees for 2003 in accordance with the price cap method both for non-domestic (TV1 tariff option) and domestic users (D1 tariff).
n. 171/02
Italian Flag
09.18.2002 settore Elettricità Modification of forms for the proposal of electric tariff options, previously set in Annex 1 of resolution n.228/01
The forms for the proposal of tariff options by distribution companies, set for 2002 in Enclosure n.1 of Authority for Electricity and Gas resolution n.228.01, are modified. The new forms are available in Annex 1 of resolution n.169.02.
n. 169/02
Italian Flag
09.12.2002 settore Elettricità Approval of the daily allocation procedures of the transport capacity on the interconnection lines between Italy and France for the year 2002
The resolution declares that the rules for the allocation of interconnection capacity by TSO (GRTN) set by article 12.1 and 12.2 of resolution n.301/01 (Enclosure A) are to be applied to all the frontiers excepted the one with France. The free capacity with France is to be allocated for a maximum quote of 50% by TSO on a daily basis, for the other 50% by Riseau de transport d'ilectriciti (the French transmission system operator), following the procedures set by the agreement between TSO and Riseau de transport d'ilectriciti, Annex 2. These rules are valid until the end of 2002.
n. 167/02
Italian Flag
09.04.2002 settore Elettricità Amendment of Authority's resolutions n.175/00 and n.151/01
The resolution states the fulfilment of the authorisation procedure for the building of new plants from renewable sources (pursuant to article 15 (2) of the legislative decree n.79/99) to one more subject (S.OL.VI.C.) that presented the requested authorisation in accordance with resolution n.175/00.
n. 163/02
Italian Flag
08.28.2002 settore Gas Bimonthly adjustment for September - October 2002 of gas supply tariff components and parameters for captive customers
For the fifth semester of 2002 the Authority for Electricity and Gas has established no changes in gas supply tariff components and parameters for captive market and will apply the values set up for the fourth semester (see resolution n.121/02). With regard to the previous level, the index for natural gas purchase cost based on international price trends of oil products, has recorded a variation of less than 5%, not allowing any changes in tariff components according to Italian supply tariff system for the captive market.
n. 162/02
Italian Flag
08.28.2002 settore Elettricità Bimonthly adjustment for September - October 2002 of electric tariff components and parameters
The Authority publishes the bimonthly adjustment of electric tariff components PG, PGT, CCA, PV, due to variation in the Ct parameter (variable unit allowed cost of electricity produced by thermoelectric plants using commercial fossil fuels), and the adjustment of components A and UC. The Ct parameter for the two months September - October 2002 is equal to 4.066 Euro cents/kWh. The PG parameter is set at 6.123 Euro cents/kWh. The increase in international fuels prices during the period April - July 2002 has caused a rise in the Vt parameter (unit allowed cost of fuels), but the appreciation of the Euro over the Dollar has helped in containing the electric tariff. On average, the rise in the electric tariff is of 1,7%.
n. 161/02
Italian Flag
08.01.2002 settore Elettricità Unified Code of the Authority for Electricity and Gas regulations concerning the continuity of the electricity distribution service
With resolution n.155/02 the Authority collects into a single unified code all the regulations concerning the continuity (outages) of electricity distribution service and, in particular, the provisions contained in resolutions n.128/99 and n.202/99 which accordingly are abrogated.
n. 155/02
Italian Flag
08.01.2002 settore Elettricità Definition of basic actual levels and performance improvement levels of service continuity for years 2002 and 2003 for territorial areas of distributors envisaged by article 2 (2) of resolution n.202/99
The Authority for Electricity and Gas defines basic actual levels and performance improvement levels of service continuity for years 2002 and 2003 for territorial areas of distributors that (pursuant to article 16.3 and 16.5 of resolution n.128/99) filed a petition in order to be exempted from the duty of recording service interruptions. For these territorial areas the definition of basic actual levels and performance improvement levels must be defined from the following year the one of temporary exemption.
n. 154/02
Italian Flag
08.01.2002 settore Elettricità Electric tariffs for low voltage domestic users for 2003
The Authority for Electricity and Gas sets new values of D2 and D3 tariffs for low voltage domestic users for 2003. In particular, since the "social" tariff for poor users is not yet on force, new transitional values towards the D1 tariff are established and, by amending the Unified Code (resolution n.228/01), the D1 is postponed for one year.
n. 153/02
Italian Flag
08.01.2002 settore Elettricità Updating for 2003 of electric transport service fees and of the amounts for the acknowledgement of service continuity improvements and energy efficiency actions
The Authority for Electricity and Gas updates the electric transport service fees for 2003 in accordance with the price cap method both for non-domestic (TV1 tariff option) and domestic users (D1 tariff). In particular, inflation accounts for 2.5%, while costs reduction for 4%. However, allowed costs for the distribution service increase owing mainly to substantial service continuity improvements achieved in 2001. On average, electricity transport prices will rise of 1.3%.
n. 152/02
Italian Flag
08.01.2002 settore Elettricità Acknowledgement of priority access rights to the transport capacity on interconnections with foreign countries, pursuant to article 10 (2) of the legislative decree n.79/99, owing to the carrying out of new electric network infrastructures
The Authority for Electricity and Gas establishes priority access rights to the transport capacity on interconnections with foreign countries in favour of those who directly carry out new electric network infrastructures in line with the transmission grid development plans decided by the TSO (GRTN). The priority rights concern the 80% of the new available transport capacity with a ceiling of 800 MW and hold for ten years. Moreover, the new lines must become operative before 31/12/2007. The measure has been justified with the aim of stimulate investments on interconnections which, in turn, promote competition in the national electricity supply.
n. 151/02
Italian Flag
07.25.2002 settore Elettricità Provisional rules till 31st October 2002 for the allocation of the interconnection capacity between Italy and Greece
The Authority for Electricity and Gas approves the document "Agreement TSO (GRTN)-HTSO about managing HVDC Link Italy-Greece, Test Operation Period" and establishes that the TSO transmits a periodical report to the Authority on the results of the capacity assignments and, according with the Greece Authority for Electricity and Gas for Energy, prepares a documents with the final rules.
n. 147/02
Italian Flag
07.25.2002 settore Gas Provisions concerning gas transportation and despatch tariffs, pursuant to resolution n.120/01
The Authority for Electricity and Gas approves Snam Rete Gas's new transportation tariffs for the thermal year 2002-2003 after that SRG initial proposal, which envisaged the inclusion of the Sicilian Regional Government's tax on gas pipelines in the transportation tariffs, has been rejected by the Authority with resolution n.120/02. Due to greater gas volumes and price cap mechanism, transportation tariffs decrease by 7%.
n. 146/02
Italian Flag
07.25.2002 settore Elettricità Delay of the terms fixed in article 9 of resolution n. 204/99
The TAR Lombardia resolutions n. 5286 and n.5288 dated 31/07/01 and the Consiglio di Stato resolutions n.390 and n.391dated 09/07/02 have cancelled the Authority for Electricity and Gas resolution n.238/00 in relation to the reduction of the fixed costs component in the electricity wholesale price as from 2001. Consequently, waiting for the grounds of the Consiglio di Stato resolution, the Authority for Electricity and Gas has decided to delay some of the terms envisaged by article 9 of resolution n.204/99, as modified by resolution n.228/01, concerning the certification of 2001 actual and allowed revenue and the possible refund to consumers by distribution companies.
n. 145/02
Italian Flag
07.17.2002 settore Elettricità Modification of resolution n.119/02
The Authority for Electricity and Gas has modified the RR (allowed revenue) value for Interpower's power plant Vado Ligure: 95,205.06 thousands euro instead of 93,967.78 thousands euro.
n. 138/02
Italian Flag
07.17.2002 settore Gas Adoption of guarantees for third party access to gas transportation network and of rules for the arrangement of network codes
The Authority for Electricity and Gas defines a system of guarantees for third party access to gas transportation network which has to be incorporated in network codes. The new rules can become effective as from next thermal year starting in October 2002. Major provisions are: right of priority for the transportation capacity allocation at the entry points of national network for TOP contracts first and, subsequently, for long term contracts (within the contracted average daily quantity); allocation method pro-rata when capacity is inadequate with respect to demand (respecting priority rights at the entry points of the national network); priority right to transportation capacity for investors in new pipelines (for a maximum of 80% of new capacity and 20 years). Moreover, the Authority envisages the introduction of a secondary transportation capacity market and a gas trading market on system, both regulated by the Authority itself. A network code model is given to Snam Rete Gas and Edison.
n. 137/02
Italian Flag
07.11.2002 settore Gas Delay of hourly basis gas measurement for final customers with annual consumption greater than 200,000 cm
The due date for the beginning of hourly basis gas measurement for final customers with annual consumption greater than 200,000 mc, which was fixed by Letta decree (article 18.5) at 10 July 2002, is delayed until 31 December 2003.
n. 130/02
Italian Flag
06.26.2002 settore Elettricità Approval of the relevant grid division by zone pursuant to Annex A, article 8 (1), of resolution n. 95/01
The Authority approves the documents "Specification of the relevant nodes" and "Specification of the zones of the relevant grid" proposed by the TSO (GRTN) and authorises the TSO (GRTN) to publish the documents on the web site.
n. 125/02
Italian Flag
06.26.2002 settore Elettricità Changes to the regulation of imposition, collection and administration of tariff components A2, A3, A5, A6
The Authority for Electricity and Gas sets new rules concerning the collection of tariff components A2, A3, A5, A6, covering general system costs, and changes the rules set in resolution n.228/01. In resolution n.228/01 these tariff components were considered as surcharges of transport tariffs both for free and captive market. In resolution n.124/02 the Authority establishes that the free customers will pay these components as surcharges of the balancing fees paid to TSO (GRTN). The TSO (GRTN) is allowed to retain the yield of component A3.
n. 124/02
Italian Flag
06.26.2002 settore Elettricità Bimonthly adjustment for July - August 2002 of electric tariff components and parameters
The Authority publishes the bimonthly adjustment of electric tariff components PG, PGT, CCA, PV, due to variation in the Ct parameter (variable unit allowed cost of electricity produced by thermoelectric plants using commercial fossil fuels), and the adjustment of components A and UC. The Ct parameter for the two months July - August 2002 is equal to 3.941 Euro cents/kWh (+8.2%). The PG parameter is set at 6.00 Euro cents/kWh. No changes are set for the components A and UC whose values remain those of the last bimester. Hence, the electric tariff for the summer will be much higher essentially because of the rise in international fuels prices during the period February 2002 - May 2002.
n. 123/02
Italian Flag
06.20.2002 settore Elettricità Determination, with reference to Interpower S.p.A.'s plants, of the allowed revenue (RR) for fixed costs covering and of the conventional productivity for 2000-2001, in order to calculate non-recoverable costs, pursuant to article 5 (3) and (8) of the ministerial decree of 26/01/00
The Authority for Electricity and Gas defines the value of the RR (allowed revenue) parameters for 2000-2001 and the conventional productivity of Interpower S.p.A. in order to determine its allowed stranded costs.
n. 119/02
Italian Flag
06.20.2002 settore Elettricità settore Gas Recommendation of the Authority for Electricity and Gas to the Government and the Parliament concerning the bill AS1149 about measures to foster private enterprise and competition
In relation to the electricity sector, the bill AS1149 establishes that in order to maximise the use of interconnection capacity, the Ministry of Productive Activities can assign the transportation capacity on the interconnection lines to final users either subscribing real time interruptible contracts or assuring, on the basis of long term contracts, the use of at least the 80% of yearly capacity. Moreover, the bill states that bilateral supply contracts corresponding to this capacity allocation are authorised by the Ministry with a derogation to the power exchange system. The Authority for Electricity and Gas underlines that on the one hand the provision hurts the independent regulatory functions, on the other, it introduces not transparent and potentially discriminatory allocation mechanisms in contrast with the provisions of the European Union proposal of amended directive 96/92/CE.
n. 114/02
Italian Flag
06.05.2002 settore Elettricità Integration of the regulation on contributions, pursuant to article 6 (11) of resolution n.70/97, regarding the transfer of electricity to the captive market
Resolution n.103/02 is related to the contributions that, pursuant to Authority for Electricity and Gas resolution n.70/97, had to be paid until 2001 to electricity production (Ct) and import (Ca) companies through the B part of the tariff. The Authority establishes that for 2000 and for the acknowledgement of these contributions, the electricity collected by the TSO (GRTN) according to wheeling contracts (for 2000 yearly inflows are bigger than withdrawals) has been withdrawn by the captive market.
n. 103/02
Italian Flag
05.08.2002 settore Elettricità Initiation of proceedings concerning the definition of economic criteria and parameters determining the annual fee for the distribution grid's owners that do not have the concession of the distribution service pursuant to article 9 (6) of the legislative decree n.79/99
The Authority for Electricity and Gas has initiated proceedings concerning the definition of economic criteria and parameters for the determination of the annual fee due to the distribution grid's owners that do not carry on the distribution service since the concession has been assigned to other operators.
n. 88/02
Italian Flag
04.30.2002 settore Elettricità Adoption of transitory conditions for the supply of the electricity despatch service
The resolution concerns a transitory economic settlement (within the transitory regulation of despatch service) of electricity balancing and exchange for the despatch service provided by the TSO (GRTN). Due to delay in the drawing up of the exchange contract and since the deadline for the payment of the exchange charges is expired, the Authority establishes the payment of an interest rate on these charges (art.3(1)). Moreover, before the communication system of inflows and withdrawals programs is implemented, the Authority envisages the payment on account of a share of balancing charges (art.3(2)).
n. 81/02
Italian Flag
04.23.2002 settore Elettricità New determination of the charges relative to the dismantling of disused nuclear plants, the end of the nuclear fuel cycle and related activities for the period 2002-2004
The Authority determines for the period 2002-2004 the "nuclear charges" that will enter into the A2 component of the transport tariffs and will be acknowledged to Sogin and to Sicn (the companies that manage the nuclear dismantling activities). The resolution acknowledges to Sogin 362,1 millions of euro and to Sicn 106,2 millions of euro.
n. 71/02
Italian Flag
04.23.2002 settore Elettricità Bimonthly adjustment for May-June 2002 of electric tariff components and parameters
The Authority publishes the bimonthly adjustment of electric tariff components and parameters gamma, PGT, CCA, PG, PV, due to variation in the Ct parameter (variable unit allowed cost of electricity produced by thermoelectric plants using commercial fossil fuels), and the adjustment of components A and UC. The Ct parameter for the two months May-June 2002 is equal to 3,641 Euro cents/kWh. The PG parameter is set at 5,698 Euro cents/kWh. A and UC components remain unchanged. The increase in international fuels prices (December 2001-March 2002) has caused a rise in the Vt parameter (unit allowed cost of fuels) and, as a consequence, an average rise in the electric tariff of 1,4%.
n. 69/02
Italian Flag
04.18.2002 settore Elettricità Approval of the standard contract drafts, pursuant to article 3 (1.1) of enclosure A to resolution n.36/02 of 7 March 2002
Within the transitory regulation of despatch service (see resolution n.317/01 and n.36/02), the Authority approves the standard contract drafts, sent by the TSO (GRTN), for both electricity balancing and electricity exchange.
n. 66/02
Italian Flag
04.18.2002 settore Elettricità Determination of final rates for years 1991-1998 for the payment by the Cassa Conguaglio of the tariff supplement due to smaller electricity companies not transferred to Enel
The Authority determines the final rates (euro cents/kWh) for years 1991-1998 for the payment by the Cassa Conguaglio of the supplement tariff due to smaller electricity companies not transferred to Enel and quantifies the adjustments.
n. 63/02
Italian Flag
04.18.2002 settore Elettricità Determination of transfer prices of electricity produced by hydroelectric plants with power of up to 3 MW, pursuant to article 22 (5) of the law n.9/91 and article 3 (12) of the legislative decree n.79/99
The Authority determines the transfer prices of energy produced by hydroelectric plants with power of up to 3 MW (which are not included in the Cip6/92 provision) and sold to the TSO (GRTN). These new prices are valid for all hydro plants including the hydroelectric fluent plants formerly regulated by resolution n.82/99. The resolution sets different prices for plants which are not able to modulate the produced energy within the time bands F1, F2, F3 and the time band F4 (the definition of time bands is set in the provision Cip45/90) and those plants which are able to modulate production.
n. 62/02
Italian Flag
04.04.2002 settore Elettricità Modification of resolution n.158/01 of 11 July 2001 and adoption of the regulation concerning the management of the fund for the research activity financing n. 55/02
Italian Flag
03.26.2002 settore Elettricità Conditions for the supply of the connection service to electric lines with nominal voltage higher than 1kV
The Authority has supplemented the regulation on electricity network access by setting the rules for requesting and implementing new connections. The provision concerns in particular the connection of new or repowered generating plants (for which at present there are connection requests for more than 100,000 MW) and of industrial consumption sites. The aim is to facilitate the construction of new power plants and to enhance competition. Requesting parties must pay a fee for the technical analysis of the new connection and may be asked to give a bank guarantee. Finally, requesting parties may implement directly the connection on the basis of the technical specifications defined by the network operator.
n. 50/02
Italian Flag
03.19.2002 settore Elettricità Conditions for the identification of joined production of electricity and heat as cogeneration, as provided by art.2 (8) of the legislative decree n.79/99
The resolution sets the criteria for acceding to the benefits envisaged by the electricity and gas liberalisation decrees for cogeneration plants. The Authority establishes that, in order to access those benefits, cogeneration plants are those satisfying two conditions: an index of energy saving of 10% for each new section of the plant (8% for repowered sections, 5% for existing sections) and at least the production of 15% of heat on the aggregate (heat and electricity) produced energy. The resolution differentiates the way in which these indicators -energy saved and quantity of heat produced- are applied on the basis of parameters such as the size of the plant section and the type of fuel used. In this way the Authority takes into account the difficulty of applying the same incentive criteria to plants which vary greatly in terms of technology and size (and, as a consequence, performance).
n. 42/02
Italian Flag
03.07.2002 settore Elettricità Modification and integration of resolution n.317/01 providing provisional rules for the supply of the electricity despatch service
The Authority for Electricity and Gas completes the transitory electricity despatch regulation into force until the start of the bidding system. In particular, resolution n.36/02 regulates the economic settlement relative to the exchange of electricity. In order to guarantee greater flexibility to operators, the Authority envisages: the possibility of compensation through the transfer between operators of electricity belonging to different hour bands (new article 7 (4)); the possibility of compensation of the economic balances' sum relative to a two-months period with the balances' sum of the following two-months period (new article 7 (4.1)).
n. 36/02
Italian Flag
02.27.2002 settore Elettricità Definition of distribution service continuity improvements in 2000 and approval of applications for 2001 pursuant to articles 8 and 9 of resolution n.202/99
Having regard to Authority for Electricity and Gas's resolution n.202/99 and on the basis of collected data, the Authority defines the service continuity improvements for 2000 and applies for the first time the system of incentives and penalties for the reduction of electricity outages by distribution companies, envisaged for the alignment to the European standards. Service continuity data for 2000 display an aggregate average improvement of 8%. In addition, the Authority approves the applications for the acknowledgement of costs sustained by operators for the maintenance of service continuity levels in 2001.
n. 27/02
Italian Flag
02.27.2002 settore Gas Criteria to define gas storage tariffs
The Authority for Electricity and Gas approved criteria to calculate storage tariffs for firm and interruptible annual service. The storage tariff will reflects fixed an variable cost and will be composed by three parties: two fixed components (annual reserved capacity and peak withdrawal capacity) and one variable component (calculated on quantities injected and withdrawn). The return on the net capital invested is fixed at 8,33%.These criteria will be applied by Eni's storage affiliate Stoccaggi Gas Italia. To enhance competition in the storage activities new entrants will not be obliged to apply regulated tariffs.
n. 26/02
Italian Flag
02.27.2002 settore Elettricità Bimonthly adjustment for March-April 2002 of electric tariff components and parameters
The Authority for Electricity and Gas publishes the bimonthly adjustment of electric tariff components PG, PGT, CCA, PV, due to variation in the Ct parameter (variable unit allowed cost of electricity produced by thermoelectric plants using commercial fossil fuels), and the adjustment of components A and UC. The Ct parameter for the two months March-April 2002 is equal to 3,514 Euro cents/kWh. The PG parameter is set at 5,571 Euro cents/kWh. The decline in international fuels prices (October 2001-January 2002) has been offset by an increase in the A3 component covering renewable and assimilated sources incentives (Cip6) so that the electric tariff remains stable.
n. 24/02
Italian Flag
01.31.2002 settore Elettricità Further provisions about competitive procedures for 2002 for the transfer of the electricity pursuant to article 3 (12) of the legislative decree n.79/99
The Authority for Electricity and Gas establishes the rules for the allocation of the unsold electricity in the competitive procedures for Cip 6 electricity according to resolution n.308/01. The Authority provides that this electricity must be sold through a new competitive procedure in accordance with the rules envisaged by resolution n.308/01. The resolution states that the antitrust ceilings set in resolution n.308/01 must not be applied in this new auction.
n. 20/02
Italian Flag
01.30.2002 settore Elettricità Revocation of resolution n. 08/02 of 21 January 2002
The Authority for Electricity and Gas repeals resolution n.08/02 concerning Cip 6 auctions rules. As a consequence, the antitrust ceilings on productive capacity set by resolution n.308/01 are restored. In particular, resolution n.308/01 states that no operator may apply for more than 20% of bands in each auction and for more than 15% of bands over all auctions.
n. 14/02
Italian Flag
01.28.2002 settore Elettricità Approval of additional tariff options for 2002 concerning the electricity service supply to captive market domestic users
With resolution n.11/02, the Authority approves additional tariff options concerning the electricity supply service for captive market domestic users which have been presented for a re-examination by operators after the modification of domestic users tariff regime envisaged by Authority for Electricity and Gas resolution n.316/01. The operators involved are Enel Distribuzione, AEM Milano, ACEA Distribuzione, AEM Torino, AGSM Verona, Deval. The main innovations are the 4,5 kW contract (in addition to previous 3 and 6 kW contracts) and the two-tier tariffs (lower price for night consumption).
n. 11/02
Italian Flag
01.21.2002 settore Elettricità Amendment of resolution n. 308/01 defining the competitive procedures for 2002 for the transfer of the electricity pursuant to article 3 (12) of the legislative decree n. 79/99
The Authority for Electricity and Gas, in order to restore conditions of certainty about the allocation of CIP6 electricity in the eligible market and considering the error of procedure in resolution 308/01 underlined by the order of the Regional Administrative Court of Lombardia of 10/01/02, amends resolution 308/01 abolishing the Antitrust ceilings and sets a new antitrust ceiling of 20% of overall productive capacity.
n. 8/02